The Professional Journey
The Professional Journey
Ukaabhi Rooh Jab Bedaar Hoti Hai Jawaanon Mein… Nazar Ati Hai Unko Apni Manzil Asmaanon Mein..
1994
Year of inception in business as Logistics Service Provider.
1997
Entered into Construction of Commercial & Industrial Projects.
1999
Began First Telecom Infrastructure Job for Celforce (Vodafone).
2001
Business Restructuring – KP Buildcon Pvt Ltd incorporated and merged all activities under one roof.
2002
Awarded telecom sites by Celforce as TSP service provider.
2004
First Owned Tower Fabrication Unit started at Sachin Industrial Estate; Industrial Projects undertaken for State Govt. Undertaking, GSEG.
2005
Bharti Telecom awarded Sites across Gujarat for new built-up as well as O&M.
2006
Pan Gujarat Operations undertaken for Reliance Group; first OFC Laying for Idea, Galvanizing Plant Started – It was first gas-based GI Unit in India.
2007
WTTIL TSP Jobs allocated for Gujarat. QUIPPO joined in list of TSP Jobs for Gujarat. No Operator Left!!!
2008
Land Acquisition for Second Fabrication Plant at Panoli Industrial Estate, O&M jobs for IDEA, HUTCH for OFC network. Incorporated KPI Green Energy Infrastructure Ltd under roof of KP Group andalso acquired Lands for first Residential Project of KPI Green Energy.
2009
Undertook massive geographical expansion into 13 States for Telecom Infra projects Pan India, Awarded Highest RFAI Award. 1000 Telecom Sites completed in eight months! Employee Strength crossed 325.
2010
Completed more than 3500 Telecom Sites Ready for Activation Completed more than 900 KMs of OFC Cable Laying. First Residential Site of 53 Flats Completed. Incorporated KP Energy Limited and diversified the business in renewable energy in Wind.
2012
MOU signed by KPI Green Energy for land acquisition of about 260 Acres with land owners.
2013
MOU with Government of Gujarat by KPI Green Energy in Vibrant Gujarat 2013 for 15MW of Solar Power Plant.
2015
Signing of MOU with Government by KPI Green Energy of Gujarat in vibrant Gujarat 2015 for next 15MW. KP Group was selected as India’s Most Promising Brands – 2015 by World Consulting & Research Corporation.
2016
KP Energy came up with Initial Public Offering and listed on SME Platform of BSE Limited. KPI Green Energy was awarded “Solar Innovation & Excellence Award – Excellence in Solar Park RISE – 2016″.
2017
KPI Green Energy signed MOU with Government of Gujarat in Vibrant Gujarat 2017 for next 20 MW. GETCO gave approval for next 15 MW (Total 30 MW) evacuation andalso gave approval for laying of second circuit on 66 KV Transmission line using Panther Conductor. KPI Green Energy awarded “Sthapatya – The Institute of Civil Engineers & Architects”.
2018
KP Energy Won Bronze Award in category of ‘Portfolio Performance – Wind Developer of the year’ for outstanding achievements in Wind Energy Sector by India Wind Energy Forum (IWEF) Excellence Awards 2017.
CSR initiative of KP Energy for conservation of mangrove ecosystem, Company planted more than 3500 Nos. of different species of mangroves and become corporate member of Mangrove Society of India. KP Energy tied up with world’s prominent wind turbine technology provider, GE Renewables India for developing Wind Power Project of 300 MW (120 Wind Turbine Generators of 2.5 MW each) connected with ISTS (Inter State Transmission System) Network at Kutch, Gujarat. KP Energy successfully migrated from the SME platform of BSE Limited to Main Board of BSE Limited.
KPI Green Energy received GEDA Registration Certificate for developing next 25 MW Solar Power Capacity at Sudi and also signed Facility Agreement with Power Finance Corporation Ltd for availing financial assistance to develop 25MW solar power project at Solarism site, Sudi, Bharuch, Gujrat. KPI Green Energy awarded “Udyog – Road towards Globalization”.
2019
KPI Green Energy came up with Initial Public Offering and listed on SME Platform of BSE Limited. Received GETCO. approval for an enhancement in solar power evacuation from 30MW to 70MW at 66KV Amod Substation, Bharuch, Gujarat. KP Energy obtained ISO 9001: 2015 (Quality Management System), ISO 14001:2015 (Environmental Management System) and ISO BS OHSAS 18001: 2007 (Occupational Health and Safety Management System) certification from Deutsch Quality Systems (DQS).
KPI Green Energy has received registration certificate from GEDA for setting up of Solar Ground Mounted Project under Gujarat Solar Power Policy – 2015 for an additional capacity of 20 MW (existing 40MW + 20MW new, i.e., Total 60 MW) at existing solar plant, village Sudi & Tancha, Ta.: Amod, District: Bharuch, Gujarat.
KP Energy aligns with CLP India Private Limited for developing a 250.8MW wind site at Dwarka for SECI Tranche-VIII bid.
2020
The flagship company of the group (KP Buildcon Pvt Ltd) has climbed the ladder of success first in the telecommunication sector and later in fabrication and received the work of 9 FRT maintenance of 2000 KM across Gujarat by VI [Vodafone Idea Limited], additionally Dabhasha factory increase production by 800 tons per month total.
KP Energy Limited is a leading provider of Balance of Plant(BoP) solutions for the wind energy industry. KP Energy aligns with CLP India Private Limited for developing a 250.8 MW wind site at Dwarka for SECI tranche-VIII bid.
KPI Green Energy Ltd. has successfully commissioned additional 25 MW of capacity aggregating to 40.7 MW under the Independent Power Producer (IPP) category and also started a new segment of business under CPP category.
During the outbreak of the COVID-19 pandemic, as India took decisive steps to contain, test and treat COVID-19 in a proactive manner, the Foundation pivoted everyday processes, built response mechanisms and helped build a resilient and inclusive society. During this period, there was a shortage of oxygen as well as ventilators in the hospitals. At that time KP Human gifted three BiPAP machines in the different COVID Care Centers so that quick treatment of COVID patients could be done who were facing an emergency situation.
KPI Green Energy has also donated Rs. 5,00,000/- in Chief Minister relief fund during COVID Pandemic.
During the COVID pandemic, KP Human has provided more than 4,000 grocery kits to the daily wage labourers and migrants, especially to those who did not hold ration cards. KP Human has also funded several programs like, Blood Donation Camp, Hijama Camp, Health Diagnosis Camp, Job Fair and other social, educational and health related activities.
2021
KPI Global Infrastructure’s Migration from SME Board to the Main Board of BSE. And listing on the Main Board of NSE.
2022
KPI Global Infrastructure Ltd. achieves 100MW in IPP.
KPI Global Infrastructure Ltd. is now known as KPI Green Energy Ltd.
KP Energy has achieved a milestone by the fastest commissioning in the history of the company by erecting 7 WTG (Wind Turbine Generator) in a span of just 3 months.
KP Group celebrates 50th Birthday of CMD – Dr. Faruk G. Patel
KP Buildcon, has achieved great milestone of approval/registration of 400KV (the highest voltage line in Gujarat) with Gujarat Energy Transmission Corporation Ltd., for below items:
- HDG Transmission line up to 400 KV D/C with Tower Accessories & SS Structure upto 400KV
- GI Earthing Strips upto 75 x 10 mm
- HDG Cable Trays